
Design and construction of expressway S7 from the Świętokrzyskie Voivodeship border to Kraków, section: Miechów junction (without junction) - Szczepanowice junction (without junction)
Voivodeship / location: Voivodeship: MałopolskieClient: General Directorate for National Roads and Motorways Branch in Kraków
The project involved the design and construction of the S7 expressway section Miechów – Szczepanowice.
Scope of Works
- Design of a dual carriageway S7 expressway approximately 5.33 km long from Miechów junction (without junction) to Szczepanowice junction (without junction) including engineering structures, accompanying infrastructure and traffic safety devices
- Obtaining on behalf of and for the benefit of the client all legally required opinions, approvals, permits, licenses and decisions necessary for the design and implementation of the investment
- Construction of the expressway including engineering structures and accompanying infrastructure
Project Characteristics
The expressway was constructed, existing roads conflicting with S7 were rebuilt, taking into account changes in their route. Emergency passages and access roads to S7 were also created. Five bridge structures were erected along the expressway.
