Design and construction of expressway S7 on the section from Czosnów junction to Kiełpin
The route runs between Czosnów and Kiełpin. The length of the Main Route is approximately 9 km.
The road runs through urbanized areas where many enterprises, production halls, and workplaces are located. Road reconstruction will significantly facilitate communication between residents and the voivodeship capital (metropolitan area), and will also improve and accelerate the operation of enterprises located in the area.
Scope of planned works
Contract value is PLN 536,313,784.41 gross. The contract with the Client was signed on 16.11.2023. The design period will last approximately 17 months until obtaining the ZRID Decision for construction works. The estimated time for handing over the S7 route to operation is spring 2027.
- Construction of three road junctions: Czosnów, Palmiry and Sadowa
- Construction of Road Maintenance Circuit (OD) with administrative-social building and accompanying buildings
- Construction of 5 road viaducts
- Construction of 4 pedestrian bridges
- Construction of 2 animal passages
- Reconstruction of existing underground and surface infrastructure
- Adaptation of existing road routes to newly designed road infrastructure
About the S7 Kiełpin – Czosnów route
The S7 Kiełpin – Czosnów route is a section of the Warsaw - Gdańsk expressway, constituting an important element of the transport infrastructure of the Mazovian region.