Construction of the Morawica and Wola Morawicka bypass in the route of national road no. 73 section II: Morawica – Wola Morawicka
The construction of the Morawica and Wola Morawicka bypass in the route of National Road no. 73 class GP from km 3+850.0 to 8+230.0 (section length: 4.38 km) is being carried out in the "Design and Build" system.
The scope of construction includes the construction of the main DK-73 route, construction of roads for servicing adjacent areas, reconstruction of cross roads, construction of engineering structures, construction/reconstruction of branch equipment and other works.
Scope of planned works
Contract value is PLN 214,889,551.33 gross. The task includes the construction of 2 road engineering structures with significant technical parameters.
- Construction of the main DK-73 route
- Construction of roads for servicing adjacent areas
- Reconstruction of cross roads
- Construction of engineering structures
- Construction/reconstruction of branch equipment
Road engineering structures
The project provides for the construction of two viaducts with advanced technical parameters, ensuring safe passage over existing infrastructure:
- Viaduct ED-2 over the Czarna Nida river: Continuous structural scheme, five-span, theoretical span Lt = 75.15 + 2 x 108.00 + 98.0 + 65.15 m, total length LC = 456.30 m, total width B = 11.40 + 1.70 + 11.40 m
- Viaduct ED-5 over the Morawka river: Continuous structural scheme, four-span, theoretical span Lt = 63.50 + 99.00 + 99.00 + 63.50 m, total length LC = 327.00 m, total width B = 11.40 + 1.70 + 11.40 m